Sensitization Campaign conducted in Dimoria and Chandrapur Block

THE OBJECTIVE OF THE SENSITISATION AND SIGNATURE CAMPAIGN 


  • To spread awareness on World Bank Project (Neer Nirmal  Pariyojana)  for sustainable Sanitation and hygiene for all.  
  • To help the members in the community to stop open defecation and construct individual household toilets and take pledge through Signature Campaign so as not to defecate in the open. 
  •  To encourage the community members to use sanitary toilet and provide information on health hazards of using unsafe toilet or defecating in the open. 


STRATEGIES USED IN SENSITISATION CAMPAIGN: 

IEC MATERIAL: 

Leaflets were distributed in all market places of each Gram Panchayat under World Bank Project area. Leaflets with message on proper use of toilet and information regarding toilet construction by Swaccha Bharat Mission for individual households. Besides, Leaflets with
information on subsidized water connection under Neer Nirmal Pariyojana for each house of Dimoria and Chandrapur block of Kamrup Metro was distributed.  Since sustainable sanitation cannot be possible without providing water in the toilet. Hence water is an integral part and Neer Nirmal Parijoyjana stresses on the need for development for all in every aspect for overall growth.

STREET PLAY (ROAD SHOW): 

Street Play was performed in weekly markets, and cross roads; where people gathered for leisure time. In every Gram Panchayat of both blocks of World Bank project area, street play was performed. The content of the play highlighted the scenario in the rural areas where people suffered health related issues due to drinking of polluted water and poor sanitation.  A total of 16 plays was presented in Assamese language and people watched with much enthusiasm.

SIGNATURE CAMPAIGN: 

To encourage the community members to use sanitary toilet, stop using kutcha toilet and even open defecation which is prevalent in some parts.  Banners and pledges were prepared for the purpose wherein; people actively participated in Signature Campaign by signing the pledge on their own will.

OUTCOME: 

The campaign was conducted in all 16 GP’s of World Bank area and street play was performed between 27th -31st of August 2016wherein; it gave a platform for the needs and problems of the community and making them aware of health hazards and urgent need for  use of  sanitary toilet and drinking pure water, free from contamination.

TEAM MEMBERS: 


  • Kumar Chandra Narayan Dev
  • Nibir Dipankar Bhuyan 
  • Goutam Borah 
  • Kabita Bora Script   
                and  Direction by Gautam Baruah (Film Director)


GLIMPSES OF ROAD SHOW AND SIGNATURE CAMPAIGN

Street Play being performed 






Leaflets & IEC Materials distributed in the community 




Signature Campaign




Thursday, 30 March 2017

Base Line Survey under Neer Nirmal Pariyojana

Introduction

To implement the  NNP project in Kamrup (M) district , it needs a base line study to  calculate the overall estimate & work plan of the project. Since the NNP project not only covers the individual household water connection system in the project area but also covers the total sanitation coverage, total cleanliness pattern of the village and a proper management system of SLWM activity in the project area to make the villages as clean villages.

For this purpose to implement this project initially district management have to collect the data on these activities such as usage by the house hold in the project area to know the current status.  Therefore a proper data collection mechanism format was designed in such a way that in future every aspect of data related to this project covers by this survey and it builds the MIS system simultaneously in a proper way.

The Base line survey mechanism used under the NNP Project was a updated survey process with new tools and technology.  The survey was conducted through a web based software with GPS data collection mechanism of the survey area by the use of tablet  or Android Mobile Phone.  In this survey process it covers all aspects of survey related with the project from House Hold level  to GP level.  The baseline survey covers the status of house hold, population, socio-economic status, sanitation status, methods adopted for disposal of solid and liquid waste and hygiene practice, status of drinking water source and quality, existing water supply scheme under the NNP project area, with proper GPS of a particular household and Photograph of any individual member of the family from where the data  collected with updated date and time.

The baseline survey is proposed to be undertaken to commence the Neer Nirmal Pariyojana operations in the project areas. The objective of the Baseline survey  is to calculate the
1.     No of House Hold in the Project area
2.     No of Village and Habitations in the project area
3.     No of Institutions in the Project area
4.     Status of Drinking water in the Project area
5.     Status of Toilet and its uses in the Project area
6.     Status of SLWM activity initiated by the House Hold in the project area
 The Baseline survey had been carried out by enumerators who has been nominated by the GP.The survey will be undertaken using web-based software through Tablet. The Baseline survey started in  the Kamru(M) district  from 15th November 2015 with 18 nos enumerators (of the total 32 enumerators). As per the Micro plan in each GP, 2 enumerator were allotted and their areas/habitations were bifurcated for smooth conduct of survey

Baseline Survey Steps:-
·        Identification of Enumerator nominated by the GP office
·        Collection of Necessary Information of Enumerators from their respective GP’s
·        Orientation training program for the enumerator
·        Handing over the tablets to the enumerators after completing all the necessary formalities
·        Refresher training programme–Conduct refresher training for the selected enumerators and handing over the necessary user login details for their selected project area.
·        Awareness Meeting with respective GP Presidents /GPWSC Members for their better understanding of the project
·        Preparation of Micro-plan –with inputs – starts and end date of Baseline survey for each enumerator.
·        Collect all necessary information after visiting  every  house hold , institutions and  put the data in the online system by the enumerator
·        Regular Monitoring of the survey process from the District through online database system.

·       Conducting refresher training for the entire survey process as and when required.

Process of Base line survey Monitoring :-
·        Regular follow up Phone Call to each enumerator
·        Sudden as well as planned visits by the district specialist in the field.
·        Creation of Whats App Group for open discussion regarding any issue.
·        Monthly  training cum review meeting in the District office
·        Creating zone wise group among enumerators and formation of Team leader for immediate help and support for any issues.

Process of Baseline Survey Verification :-

Selection of Block Co-ordinator :-
To check and monitoring the data entered by Enumerators during baseline survey,  two numbers of Block Co-ordinators were selected for two nos of project blocks from the existing good performing enumerator after selection through a selection process conducted by the district team.  The activity performing by the block co-ordinators are
·        To provide guidance and support to all the Enumerators under jurisdiction
·        Randomly  check the online records  with field and have to flag the mismatched data for necessary action  after field verification
·        Verification of baseline survey and check for any duplicate surveys as well
·        Accept the correct records in online database system.
·        Calculate the Left out Household records.

Selection of Flying Squad Team -
The Flying Squad team was officially formed on 25th  Octobar 2016 to complete  any left out House Hold  survey in the project GPs. By end of August 2016 almost all the enumerators had submitted their tablets, hence the Flying Squad was formed with some experts existing enumerators to complete all the left out house hold surveys found in  nook and corner of the project area.

Obstacles Found During Base Line Survey

Sl No
Issues Found
Remarks
1
Network Issue
 Majority of the areas had no network coverage due to geographical region of Kamrup(M) District. There were login issues, syncing problem.
2
Low Battery Backup
The maximum no of  tablet use by the enumarator are found low battery backup. Due to these after completing a few no of HH survay thay  had return back
3
Synchronisation Issue
Due to fluctuation of mobile network always enumerator get faced to synchronised the data with the survey, therefore survey process get delayed.
4
Lost of Data
Enumerator of Kamrup(M) has faced the data lost at the time of data synchronisation, due to this they had conduct the resurvey process after confirmation of data lost.
5
Tablet Issue
During the survey process three nos of tablets get broken and eight nos of tablet has shown network and camera related problems.
6
Language barrier
In some portion of Nortap, Dhupguri, Borkhat, Komarkuchi and Amsing GP the engaged enumerator  were not able to communicate due to language barrier as they were unaware of certain specific dialect of that particular community.
7
Low density of population and remoteness and inaccessibility.
The inner area of maximum GPs such as Nortap, Komarkuchi, Borkhat, Dhupguri, Sonapur, Digaru, Amsing, Pachim Mayong, Maloibari are almost inaccessible, or the density of population is low and each houses are far from each other or have no roads for travelling to reach the Households
8
Trust issue
Maximum rural community do not trust the enumerators to share personal details and hence does not co-operate during the survey process.
9
Absence of Enumerator & engaging from other GP
In some GP's enumerators selected through GP were not interested to continue with the base line survey hence after repeated attempts to recruit new enumerators the issue still persisted and the base line survey got delayed in those particular GPs. Later new enumerators were hired from other GP who are not acquainted with the demarcation and boundary of the GP for which the baseline survey initially suffered. Later with the help of PRI members  demarcation was sorted by the office
10
Leaving Work in the Mid Time
Some enumerators left the Survey process in the mid of BLS because of hardwork, bad roads, inaccessibility, communication issue, Language barrier and  delay in remuneration process.
  
Some Important Outcomes of Base Line Survey
For Kamrup(M) District :-
   1.  The Largest Block with Maximum Nos of House Hold is Dimoria Block
   2. The Highest House hold GP in the Project area is Panikhaity GP under Chandrapur Block (4056 Nos of HH)
   3. The Highest House hold GP present under Dimora Block is Hahara GP (2878 Nos of HH)
   4. In the  Chandrapur Block around 52% has APL HH and 48% BPL HH of entire population of the block. 
   5. In the Dimoria Block around 40%  has APL HH and 60% has BPL HH of entire population of the block
   6. In the  Chandrapur Block around 26% HH belongs to SC,  16% HH  belong to ST, 58% HH belongs to GEN and Inthe  Dimoria Block around 25% HH belongs to SC,  33% HH  belong to ST, 42% HH belongs to GEN
   7. No of Illiterate person in the Chandrapur Block is 19% and Dimoria Block is 23%  out of total populations of the block whereas  47% of Chandrapur Block and 50% of Dimoria Block educated between 6th to 12th Level.
8.Out of total HH of the block around 40% HH of Chandrapur Block and 55% of Dimoria Block has Katchha House where as 39% of Chandrapur block and 25% of Dimaoria Block has Pakka House
9. Out of total HH  Honour of the block around 29% HH  Hoourof Chandrapur Block and 38%  HH honour of Dimoria Block are Daily Wage Labour where as 28%  HH Honour of Chandrapur block and 22%  HH Honour of Dimaoria Block are self employed.
10. Out of total HH  of the project area 42% of the HH does not satisfied with existing water source whereas 25% of the House Hold said that they are partially satisfied with existing water source and 33% of the total HH said that they are satisfied with the water source used by them

Conclusion :-


The Base line survey for Kamrup(M) has started on 15th Nov/2015 with 16 enumerators and the BLS concluded on 31st January/2017. The total nos baseline surveyed by the enumerator as on 31st January are 16 Nos of GP, 37706 Nos of  HH, 509 no of  Habitations, 1154 nos of  institutions. While the verifications of Base line survey started in Mar/2017 and 100% verifications of all the survey was completed in January/2017.

The report has attempted to analyse information collected through the baseline survey on the status of house hold, population, social economic status, sanitation, methods adopted for disposal of solid and liquid waste and hygiene practice, status of drinking water source and quality, existing scheme under the NNP project area. The findings for the study are to be used as the data for the NNP Kamrup(M) Project.

The Primary type of employment under the project area is Daily Wage Labourer (13350 no of HH  Honour), followed by  self-employed  ( 8859 Nos of HH Honour) . The nature of the house under the project area is Kutcha House (18927 nos ).  The major source of water are Private Open Well (14571 nos of HH), followed by Public Piped water Supply (5989 Nos of HH)

In the project area under Kamrup(M) district majority  of the house hold has faced water quality issue with  16754 no of household starting that they have water quality issue and 15650 Nos  of the household complaining that they are not satisfy with the present water supply source.  The availability of the toilet under the project area covers  is 23624 Nos of HH
           
Regarding Disposal of liquid waste 18005 nos of the household have said that they use the Kitchen Garden for disposal of liquid waste followed by 12348 nos of HH disposel it in by proper Drainage system. For disposal of solid waste 22039 nos of the house hold burn their house hold solid waste followed by thrown away the solid waste followed by 9982 nos of HH.

Photograph of Base Line Survey


Picture :- Refresher Training of Enumerator




Picture :- Survey Conducted by Enumerator at House Hold level



Picture :- Refresher Training of GPWSC



Picture :- Awareness Meeting regarding importance of BLS


Picture :- Photograph of Base Line Survey verification at GP level and in the Field

Sunday, 19 February 2017

Introduction

The Government of Assam is implementing the World Bank assisted Rural Water Supply & Sanitation Project in Kamrup Metro district for providing potable drinking water to the villagers in 24/ 7 model, with the support from the World Bank. This report will reflect about the aims & objective of the proposed scheme prepared incorporating the comments / observations on the preliminary report and discussions at various levels at different forums.
This Composite Water Supply Scheme for sustainability and quality in Kamrup District will be implemented in two Zones. Zone-I will cover the habitations of Chandrapur Development Block and Zone-II will cover all the habitations under Dimoria Development Block.
In zone-I , 4 nos. of existing rural water supply scheme out of 25 have already crossed 15 years of commissioning and 2 nos. are more than 30 years commissioning. All these schemes were designed for a period of 15 years with 40 lpcd level of supply. Similarly in Zone-II Out of the 105 existing schemes, 14 nos. has already crossed its life design life span i.e 15 years and 5 nos are more than 30 years old. The level of service in accordance to the need of the consumers cannot be maintained by these old schemes.
The quality affected habitation in the project area are as follows :

Affected Quality of Water
Zone-I
Zone-II
Iron affected
29
79
Fluoride affected
11
18




The concentration of fluoride level in certain areas like Mathgharia is as high as 9.2 ppm and several residents of the locality exhibits fluorosis symptoms like melting of the teeth as well as skeletal deformity is prominent amongst the children of age 6-8 years. The fractured rocky layer with discharge ranging from 7500LPH – 15000LPH is to be tapped as ground water source and inadequacy is experienced to run the scheme. Moreover, cynical behaviour of fractured zone are very often found to be too expensive.
In the context of the above, and water being a very basic need, the Public Health Engineering Department, Government of Assam has decided to go for a Large Multi village rural water supply scheme in Kamrup District under World Bank assisted RWSS-LIS project in Assam.
 Hence, it is of utmost important to switch over to alternative safe source and it is proposed to cover the entire area with water from a surface source namely River Brahmaputra and River Kolong flowing in the vicinity of the project area.
The River Kolong is flowing along the side of the command area which has substantial surface flow throughout the year to draw required quantity of water for the proposed water supply scheme even in the lean period. Average Run-off of River Kolong is 48.5 Cumec. Intake arrangement with floating barge has been considered for withdrawal of raw water from river Kolong at Singimari for Zone-I and  Amora Pathar for Zone-II respectively.
In addition to that NNP project will support the software activity for sanitation which will be carried out under world bank project areas.

Project Implementation

           To implement the said project, World Bank support the scheme under Neer Nirmol Poriyojana in the Kamrup(M) district for Dimoria and Chandrapur Block. A Project implementing unit is formed for planning , implementation & guideline formulation for operation & maintainance. This unit is formed as per Govt norms under EE, PHED, Guwahati Div-1 with some designated engineers of concerned department and domain specialist support staff. Similarly to implement the project in GP’s the GPWSC committees are formed in each and every GP’s under project areas and MVWSC is at district level to monitor the activity of GPWSC and act as project governing committee.
               
Fund provision for the proposed mega water supply project under NNP, the total project cost will shared between world bank , Govt of India, Govt of Assam and the Community belong to the project areas. World Bank share is 50%, Central Govt Share is 44.5%, state govt share is 4.5% and community share is 1%. The community share will be beared by every beneficiary under the project areas.
               
The Neer Nirmol Pariyojna not only covers the house hold level piped water supply connection but it also covers all the institutional level establishment .The project will also cover sanitation and facilitate development of proper Solid and liquid waste management system in the project area. For this reason it is important to collect all the detail information of every house hold regarding socio-economic & socio-cultural status. Regarding that a proper base line survey is conducted with the GPS co-ordinate system under the project area. The survey is done by the enumerators (2 Persons from each GP) in their respective GP selected by the GPWSC committee. The first phase of base line survey is completed in the month of Aug/2016.


 Community Contribution collection process initiated by the Deptt in the respective GPs under project areas through awareness generation to sensitize the community to well versed about the project and secondly regarding the guideline of the collection process. It was conveyed to the community that how much vital is the contributing amount for implementation of the NNP Project.  To collect the contribution and keeping the records community mobilizers are engaged at GP wise (2 Nos from each GP) through the GPWSC following proper selection process.  The community mobilizers are properly trained toward conducting IEC, IPC for ensuring the community participation. They were oriented through some inclusive training structured by the DPMU team to orient them toward awareness generation. The collection process was started during the month of Mar/2016. 
The collected contribution of the GP regularly deposited by the Mobilizer to the Bank & concern GPWSC maintain the cash book for proper handling of the capex contribution. DPMU initiate the process of bank account opening for each GPWSC committee.

No’s of activities carried out by the community Mobilizers to achieve the target. The activities undertaken by them geared up the community participation process in the project area.

Type of treatment for Drinking Water

Since source of water for the proposed project is surface water to be tapped from rivers, conventional treatment process having facilities for Aeration – Coagulation – flocculation – Filtration, followed by Disinfection is proposed. Along with the treatment plant there shall be a quality monitoring laboratory. The treatment plant shall be operated for 20 hours a day as per the engineering matrix fixed by WB Technical consultants.

Project Design

          With the support of World Bank the Deptt prepared the design of the Composite Water Supply Scheme for Dimoria and Chandrapur Block. A plan (Detail Project Report) was initiated during the year 2012 as per projected population on the basis of 2011 census data. The water supply arrangement has been planned as per the standard norms to ensure 24x7 water supply for the proposed layout. Design parameters used have been adopted according to the guidelines provided in CPHEEO manual. The water distribution network is being designed with  LOOP Software.

The present proposed Scheme is designed to cover all streets, lanes, by lanes and localities of the habitation with safe dependable local be pumped into ESR proposed within the habitation through pumping main and from the ESR, the water will be supplied to the end users through Gravity main (distribution main) with a ferrule provision outside each house, to enable the house holds to get their house hold connection through the GPWSC  and MVWSC concerned.