Since source
of water for the proposed project is surface water to be tapped from rivers,
conventional treatment process having facilities for Aeration – Coagulation –
flocculation – Filtration, followed by Disinfection is proposed. Along with the
treatment plant there shall be a quality monitoring laboratory. The treatment
plant shall be operated for 20 hours a day as per the engineering matrix fixed
by WB Technical consultants.
No comments:
Post a Comment